NOVASEA
Case studies

Results measured, at clients like you.

Retailers, brands and manufacturers in Europe, the UK and North America: here is what NOVASEA changed, backed by numbers.

300+active clients
12 to 22%in purchasing savings, on average
98.6%of batches accepted at 1st inspection
15–30%of freight saved through consolidation
Gloved hands lighting with a flashlight the welded corner of an anthracite aluminum chair frame, in a workshop
Outdoor furniture

Furniture retailer, France

−18%on purchase cost
0claims on 2 containers
6 monthsfrom brief to 1st container
The challenge
Two unreliable suppliers, 9% customer returns on the garden range.
What we did
Audit of 5 factories in Foshan, new supplier under contract, inspection of every batch, consolidation of 3 suppliers.
Functional test of connected devices on an antistatic mat
Consumer electronics

Connected-device brand, Netherlands

24 hto block the run
$0in extra client cost
100%compliant batches since
The challenge
A component swapped without notice, CE compliance at risk three weeks before a launch.
What we did
Inspector on site within 24 hours, production run blocked, rework at the factory's expense, systematic during-production inspection.
Two hands measuring with a tape the edge of a pale blue duvet cover folded on an inspection table
Home textiles

E-commerce distributor, United Kingdom

−27%in freight cost
1delivery per month instead of 11
3 wksof lead time saved
The challenge
11 suppliers, 11 shipments and 11 customs clearances per season.
What we did
Monthly consolidation in China, one container, delivery to Manchester, monitoring in Bridge.

A similar project? Let's talk.

Describe your product and your current situation: a project manager from your industry will get back to you with an initial analysis.

White-gloved hands placing a mirror housing on a checking fixture, dial indicator in contact
Automotive parts

Aftermarket distributor, Germany

0.3%returns after 12 months
3factories audited
−14%on unit price
The challenge
4% return rate on a line of mirrors, supplier unreachable.
What we did
IATF audit of 3 factories, full PPAP file, during-production inspection, contract with penalties.
Technician adjusting a vacuum chamber containing airless bottles
Cosmetics

Independent brand, Canada

0leaks since the switch
3consecutive compliant batches
5 wksless lead time
The challenge
Airless bottles: leaks and shades varying from one batch to the next.
What we did
New supplier in Guangzhou, sealed golden sample, 100% leak test, delivery to Montreal, with the client remaining the importer of record.
Two hands adjusting the lid of a navy blue rigid gift box on a workbench, steel ruler and stacks of boxes
Premium packaging

Spirits house, United Kingdom

ΔE < 1.5on all shades
100%delivered before November
2factories in parallel
The challenge
Year-end gift boxes: shades and foil stamping out of tolerance, tight schedule.
What we did
Print proof sign-off checked at the factory, colorimetric measurement, inspection before loading, partial air freight.
Free quote · No commitment

Your project will be our next client case study.

Describe your product and volumes: a project manager from your industry replies with feasibility, the relevant manufacturing hubs and an indicative landed cost.

  • Reply within 2 business days
  • NDA on request
  • Dedicated project manager